Construction Update
Northbound Highway 101
Sunday nights from 9 p.m.-7 a.m,. the highway will be one lane from Bailard Ave. to Sheffield Dr. with on- and off-ramps at Bailard Ave., Casitas Pass Rd., Linden Ave., Santa Monica Rd. and N. Padaro Ln.
Monday – Thursday nights from 8 p.m.–7 a.m., the highway will be one lane from Bailard Ave. to Sheffield Dr. with on- and off-ramps at Bailard Ave., Casitas Pass Rd., Linden Ave., Santa Monica Rd. and N. Padaro Ln.
The northbound on-ramp at Ortega Hill Rd. will be closed for up to 8 months and is anticipated to reopen on Feb. 14, until then drivers can use the on-ramp at Sheffield Dr.
The off-ramp at Sheffield Dr. will be closed for up to 6 months and is anticipated to reopen Oct. 3, until then drivers can use the off-ramp at San Ysidro Rd.
Southbound Highway 101
Sunday nights from 10 p.m.-7 a.m., the highway will be one lane from Sheffield Dr. to Bailard Ave. with the on- and off-ramps at Carpinteria Ave., Reynolds Ave., Linden Ave., Casitas Pass Rd. and Bailard Ave.
Monday – Thursday nights from 8 p.m.–7:30 a.m., the highway will be one lane from Sheffield Dr. to Bailard Ave. with on- and off-ramps at Carpinteria Ave., Reynolds Ave., Linden Ave., Casitas Pass Rd. and Bailard Ave.
The off-ramp at Evans Ave. will be closed for up to nine months and is anticipated to reopen on Oct. 24, until then drivers can use the southbound off-ramp at Sheffield Dr.
The off-ramp at S. Padaro Ln./Santa Claus Ln., will be closed for up to seven months and is anticipated to reopen Oct. 19, drivers can use the off-ramp at Carpinteria Ave. to Santa Ynez Ave., Via Real and S. Padaro Ln.
N. Jameson Ln. by Sheffield Dr.
On the week of July 11 from 9 a.m. – 3 p.m., flaggers will direct traffic on N. Jameson Ln. by the northbound on-ramp at Sheffield Dr. to allow crews to remove temporary safety barriers and fencing. Drivers are reminded to be mindful of sharing the lane with bicyclists during this time.
On S. Padaro Ln. under Hwy. 101, 9 p.m.-6 a.m., flaggers will direct traffic as needed during bridge work. Trucks over 40′ will not be able to turn right onto S. Padaro Ln. from Santa Claus Ln. during this stage of bridge construction.
Please note: Consecutive ramps in the same direction will not be closed at the same time (unless where noted) to allow drivers to use a ramp before or after a closure. To view timelines, detours, and maps, please visit www.SBROADS.com and select the project segment.
– Katherine Zehnder